{"id":3593,"date":"2025-09-25T10:03:07","date_gmt":"2025-09-25T10:03:07","guid":{"rendered":"https:\/\/skat.qps-dev.net\/?post_type=document&#038;p=3593"},"modified":"2025-11-26T07:00:29","modified_gmt":"2025-11-26T07:00:29","slug":"integrated-planning-methods-for-zero-emission-building-projects-2","status":"publish","type":"document","link":"https:\/\/www.zeb-china.org\/en\/document\/integrated-planning-methods-for-zero-emission-building-projects-2\/","title":{"rendered":"Integrated Planning Methods for ZEB Projects (CN\/EN)"},"content":{"rendered":"<p>This ZEB Talk explores integrated planning for zero emission buildings, with expert insights from Prof. Adrian Altenburger and Dr. Shicong Zhang. Prof. Altenburger presents key principles from the Lucerne Model and a Zurich Airport case study, highlighting team synergy and lifecycle planning. Dr. Zhang shares six challenges from Chinese demonstration projects, including cost control and standard alignment. The session emphasizes the importance of interdisciplinary collaboration and new approaches to achieve innovation and sustainability.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This ZEB Talk highlights integrated planning, featuring Swiss and Chinese insights on lifecycle design, project challenges, and interdisciplinary collaboration.<\/p>\n","protected":false},"featured_media":8981,"template":"","meta":{"_acf_changed":false,"footnotes":""},"document_category":[105,29,8,11,98,95],"knowledge_hub":[164],"class_list":["post-3593","document","type-document","status-publish","has-post-thumbnail","hentry","document_category-chinese-english-cn-en","document_category-planning-operations-guidance","document_category-policy","document_category-solutions","document_category-video-media","document_category-zeb-talk","knowledge_hub-knowledge-hub"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/document\/3593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/types\/document"}],"version-history":[{"count":4,"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/document\/3593\/revisions"}],"predecessor-version":[{"id":8980,"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/document\/3593\/revisions\/8980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/media\/8981"}],"wp:attachment":[{"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/media?parent=3593"}],"wp:term":[{"taxonomy":"document_category","embeddable":true,"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/document_category?post=3593"},{"taxonomy":"knowledge_hub","embeddable":true,"href":"https:\/\/www.zeb-china.org\/en\/wp-json\/wp\/v2\/knowledge_hub?post=3593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}