Integrated Multi-Energy System Planning (EN)

The E-Hub method optimizes energy systems for Sino-Swiss ZEB projects in Wuxi and Dalian. Using digital twins, it identifies low-carbon, cost-effective solutions. Façade PV and integrated planning are key to emission reduction. The approach supports stakeholder collaboration, data-driven decisions, and highlights the importance of policy and cultural factors in sustainable building development.

[custom_image_repeater_slider]
5.14 MB PDF file format Downloaded 25 times
[custom_image_repeater_slider]

Related Resources

ZEB Talk /

Minergie – The Swiss Green Building Standard (CN/EN)

Video
This ZEB Talk presents Swiss MINERGIE certification and China’s near-zero energy building progress, highlighting simplicity, efficiency, and applicability.
ZEB Talk /

PV Battery Storage (CN/EN)

Video
This ZEB Talk examines PV battery storage for emission reduction, comparing AC/DC coupling, self-consumption optimization, peak shaving, and backup power.
ZEB Talk /

Schindler – We Elevate: Elevators for new buildings (EN)

Video
This ZEB Talk showcases Schindler’s energy-efficient elevators, featuring regenerative drives, standby modes, smart controls, and ISO-based life-cycle performance.